1
00:00:00,100 --> 00:00:08,292
A failed pre-shipment inspection should not trigger an immediate shipment, an automatic legal rejection, or a photo-only rework claim.

2
00:00:08,242 --> 00:00:11,184
First, place the lot on hold.

3
00:00:11,184 --> 00:00:16,835
Identify the purchase order, product revision, lot, report and inspection date.

4
00:00:16,835 --> 00:00:23,906
Then verify the inspection basis: sample size, AQL, approved specification and evidence IDs.

5
00:00:23,906 --> 00:00:28,736
Acceptance sampling supports a disposition decision for the defined lot.

6
00:00:28,736 --> 00:00:32,460
It does not prove an exact lot-wide defect rate.

7
00:00:32,460 --> 00:00:37,369
Separate critical, major and minor findings from the sampling result.

8
00:00:37,369 --> 00:00:44,309
Contain the inspected lot, identified defects and any adjacent stock that may share the same process cause.

9
00:00:44,309 --> 00:00:47,278
Rework corrects observed product.

10
00:00:47,278 --> 00:00:54,739
Corrective action must also explain why the issue occurred, why process controls missed it and why it was not detected earlier.

11
00:00:54,739 --> 00:01:02,578
The action log should identify scope, containment, root cause, permanent action, owner, due date and acceptance evidence.

12
00:01:02,578 --> 00:01:10,299
Critical, safety, regulatory, systemic or weakly evidenced issues usually justify independent reinspection.

13
00:01:10,299 --> 00:01:15,911
Define the reinspection scope, sampling method and pass criteria before the visit.

14
00:01:15,911 --> 00:01:19,830
Do not let the supplier present only its best carton.

15
00:01:19,830 --> 00:01:29,283
Finally, record one written disposition: accept, accept after verified rework, accept under a documented concession, or reject and replace.

16
00:01:29,283 --> 00:01:33,736
Name the lot, report revision, remaining risk and approver.

17
00:01:33,736 --> 00:01:36,966
A failed report is not the final answer.

18
00:01:36,966 --> 00:01:42,890
An issue-closed statement without evidence and a verification gate is the start of the next failure.